Learning Facility required to redo and fix an old painted floor of a multipurpose room, storage room and operation offices totaling 6,500+ sq ft. in a short period of time due to classes commencement.
The floor was grinded and patched as required. A decorative flakes aggregate system was installed under selected colors and patterns in all areas involved and prior to the start of classes as requested.