30,000+ sq ft Food & Beverage Distribution Facility with major concrete cracks and imperfections in all the aisle ways, ramps and storage areas that were causing considerable damage to forklifts and moving equipment generating excessive maintenance costs. Concrete was repaired, patched and clear epoxy sealed as well as ramps were filled, properly pitched and epoxy+silica sand broadcasted.